Utility Solar Array 14
01The challenge
A 240-point utility array on a tight construction schedule with a single access road.
02Site conditions
Loose sand mix over compacted subgrade, minimal load-bearing without deep footings.
Sand mixSOIL SECTION · SITE-SPECIFIC
PLAN DRAWING · SLEEVE LAYOUT
03Engineering approach
Single crew, sequential driving pace matched to panel-mounting crews behind them.
PEN — 240 point04Installation
Installed in 18 days, 240 points.
INSTALL · 01
INSTALL · 02
TECHNICAL DRAWING
05Construction gallery
FRAME 01
FRAME 02
FRAME 03
FRAME 04
FRAME 05
06Performance
18 days
Install duration
2.2×
Bearing capacity achieved
82%
Concrete saved
0 m³
Soil excavated
07Lessons learned
[What the team would change or what surprised them on this install.]